However, these systems are located in a limited number of locations globally, where response times to offshore location may vary from 2 to 6 weeks, depending on the location of the incident.
Conventional assemblies are dependent upon a specific class of vessel with the capability to deploy these bulky BOP capping stacks.
Furthermore, compliance with the regulatory requirements governing well control response times pose serious issues in being able to deploy in a timely manner.
Coupled with Boots & Coots' Relief Well Service, the development of the Global Rapid Intervention Package (GRIP) demonstrates a step change in subsea response by providing the most rapid response possible.