Effective oil production volumes and production safety at the Vostochno-Messoyakhskoye field have largely been secured through the use of digital technologies - Messoyakhanefegaz having launched an integrated field development centre, featuring a high-tech digital twin complex, in 2021.
Computerised simulations of wells, pipelines, and oil and gas treatment facilities generate a digital replication of this standalone oilfield, synchronised with actual production processes and capable of replicating the full production cycle, from reservoir processes to oil delivery.
An effective geological prospecting programme throughout the Messoyakha group of fields has led to the discovery and quick commissioning of 10 new deposits, with total reserves of around 50 million tonnes of oil.
2021 saw Messoyakhaneftegaz commission a geo-technical monitoring complex, involving the use of energy-saving green technology, for its underground APG storage facility at the Zapadno-Messoyakhskoye field - part of a programme ensuring the optimum use of subsoil resources.
This complex scans oil-rim gas-bearing strata round the clock, while ultra-responsive sensors monitor the technical parameters of hydrocarbon injection and distribution within the storage facility.
More than 1.8 billion m3 of APG have now been injected into the natural reservoir at the Zapadno-Messoyakhskoye field, ready for subsequent use.
Other important areas include implementing sustainable development and responsible subsoil usage programmes, including the use of APG injected into the Zapadno-Messoyakhskoye underground storagefacility, implementation of which will speed-up the development of potential reserves.




