Paris, June 12 - Neftegaz.RU. Total has started up production from the Culzean gas condensate field located on Block 22/25a, 230 km off the coast of Aberdeen, in the UK. With a plateau production of 100,000 barrels of oil equivalent per day (boe/d), Culzean will account for around 5% of the UK’s gas consumption, bringing to 18% the proportion of the country’s gas demand supplied by Total.
“Culzean is a good example of our efforts to upgrade our portfolio in the North Sea over the last years, notably by bringing Total and Maersk Oil together. The Culzean field is located in the Central Graben area, close to the Elgin-Franklin fields, also operated by Total, thus generating synergies.”
Discovered in 2008 by Maersk Oil, the Culzean field contains resources estimated between 250 and 300 million barrels of oil equivalent. The project includes the drilling of 6 wells, the construction of 3 bridge-linked platforms and of a Floating Storage and Offloading unit.
Gas from Culzean is exported via the CATS pipeline and the UK National Grid whilst condensate is stored in the FSO for offloading by shuttle tanker.
Total operates Culzean with a 49.99% participating interest, alongside BP (32%) and JX Nippon (18.01%).




