USD 92.0134

-0.12

EUR 98.7187

+0.01

Brent 89.38

+0.05

Natural gas 2.285

+0.36

906

CNOOC Limited announces Bozhong 19-6 condensate gas field phase I development project commences production

It is expected to achieve a peak production of approximately 37,000 barrels of oil equivalent per day in 2024.

CNOOC Limited announces Bozhong 19-6 condensate gas field phase I development project commences production

Moscow, November 14 - Neftegaz.RU. CNOOC Limited announced that Bozhong 19-6 Condensate Gas Field Phase I Development Project has commenced production.

The project is located in central Bohai Sea, with an average water depth of approximately 20 meters.
The main production facilities include 1 newly built central processing platform, 3 unmanned wellhead platforms and 1 gas process terminal.
65 development wells are planned to be commissioned, including 42 production wells, 20 gas injection wells and 3 water source wells.
It is expected to achieve a peak production of approximately 37,000 barrels of oil equivalent per day in 2024.

Zhou Xinhuai, CEO and President of the company, said:

  • the project is the first condensate gas field with a proved in-place volume of over 200 billion cubic meters natural gas that has been put into operation in Bohai Bay, relying on the Bozhong-Kenli Oilfields Onshore Power Project;
  • the gas field will supply stable clean energy to the Beijing-Tianjin-Hebei region and the Bohai Rim region, and contribute to the low-carbon and high-quality development of the company.

CNOOC Limited holds 100% interest in this project and acts as the operator.

Follow us on Google News
Advertising at neftegaz.ru

Subscribe to our newsletter

of the best materials Neftegaz.RU

* Incorrect E-Mail Address

By clicking the "Subscribe" button I accept the "Agreement on the processing of personal data"


Advertising at neftegaz.ru