Drilling is expected to take 100 days, with the well due to be completed during June.
A possible discovery could be tied back to Gullfaks C, reports Bengt Beskow, exploration manager for the Tampen area.
"Exploration close to existing installations is important if we're to ensure the recovery of as much of the remaining resources in the mature areas as possible."
He adds that several other extended-reach wells have already been drilled in the Tampen region from fixed installations.




