Company-wide, Suncor's total greenhouse gas emissions for 2005 were 9.9 million tonnes, a 7.9% drop from 2004. However, greenhouse gas emission intensity (emissions per barrel of oil) increased by 3.7%.
Suncor's greenhouse gas performance in 2005 was affected by a fire at its oil sands facility near Fort McMurray, Alberta, which reduced annual production levels by nearly 25% from 2004. But total greenhouse gas emissions from the facility decreased at a slower rate, due to several energy-intensive steps the company took to protect its operating units from cold weather damage.
"From the point of view of our climate change objectives, 2005 was a challenging year," said Rick George, Suncor's president and chief executive officer. "But we are back on track with our efforts to actively manage greenhouse gas emissions."




